13 Nov FR assisted in the removal of 2 USTs and with soil excavation dig, Los Angeles
FR assisted in the removal of 2 USTs and with soil excavation dig and haul hear downtown Los Angeles. The project consisted of removing approximately 300 cubic yards of impacted soil to designated landfill, while conducting 1166 monitoring and assisting in the re-construction of the service station