13 Nov FR conducted a full Phase I, PCA, and Probable Maximum Loss Report, El Monte
FR conducted a full Phase I, PCA, and Probable Maximum Loss Report for customer who was looking to redevelop a recycling center in El Monte. The project also consisted of removing multiple drums and totes containing hazardous waste.